PARKWOOD RETIREMENT VILLAGE
WATER MAIN UPGRADE
PROJECT DETAILS
YTB were recently engaged for this high risk water connection which invoked a large 500mm Cut in. The connection was approx. 12 meters long and had 4 large water meters coming off it.
Being a council main we had a strict timeline that we had to complete the connection so the water could be turned back on. During that time our scope consisted of the removal of the exiting 500mm Asbestos pipe, installing the new 500mm DICL pipe and fittings, pouring all thrust blocks, taking the new service lines to inside the boundary and installing water meters. All works were completed in 2 shifts and water was turned back on well before the due time.
Client Testimonial
"When working with large Tier 1 clients and builders it’s critical that we minimise downtime as much as possible and do everything we can to not interfere with their schedule or slow down their building timelines – which is why I need people around me that I can rely on. We’ve been working with the people from YTB Plumbing for around 2 years now for one primary reason – complete dependability. They are extremely organised, they get in and get out without any headaches, and they consistently do a great job out on site – it’s almost as if they’re an extension of our own operation."
Peter Attard
Director