MAIN BEACH PDE. CIVIL CONNECTIONS

CIVIL CONNECTIONS

PROJECT DETAILS

YTB were awarded the civil water, sewer, and stormwater connections for the new Dune Tower in Main Beach. Main Beach Parade is the main Road for the GC 500 track so this job was always going to be tricky.

Water was a 150mm cut in during a network shutdown complete with a double stacked water meter assembly. Sewer connection was to construct a 3 meter deep man hole over an 150mm council main in the parking lane of Main Beach Parade and take a new 150mm line into the boundary. The stormwater connection had to be done on night shift due to location and scope of works was to construct a manhole over an existing 750mm council main and a full 375mm road crossing across Main Beach Parade complete with a lip in line gully pit.







Client Testimonial

"As a company that’s been established on the Gold Coast for 15 plus years, it’s always been hard to find a level of service that Pete from YTB gives with the civil connections. We’ve been using YTB for nearly 5 years now and couldn’t recommend the team enough. From Low-risk connections to intricate OPW sewer diversions on main road corridors, the team at YTB seem to get it done without any hassles or issues. YTB’s relationship with all third-party entities on all civil connections are very close and well respected which is defiantly a reflection of the high level of professionalism and attention to detail on every job they have completed for us whether it be big or small. As YTB is a family owned and operated company it’s not uncommon to call the office to be redirected to peter the owner who will be onsite with his team and still take the time to discuss future works. It’s this reason YTB is our only choice when it comes to civil connections."

Jesse Backholm

Construction Supervisor

LET'S WORK TOGETHER

Interested in our civil connection services?
We'd love to work with you.