1st AVE BURLEIGH HEADS

WATER MAIN UPGRADE

PROJECT DETAILS

There were two sections to this job. First was to upgrade approx. 30 meters of 375mm asbestos main with a new 375mm DICL main. The were numerous off sets, puddle flanges, tees, valves etc. in this 30 meter run. There was critical timing on this network shut down and works had to be completed as quickly as possible due the size of the main and the risk at stake for leaving a main like that turned off so long. The second section was to tee off the 375mm main and run a new 150mm main up along the verge which was 60 meters long. Off this main there was an end of line arrangement for a future extension and also a 150mm service to feed a new residential tower which is getting constructed. The team had to take there time and dig carefully on this job as there was existing services everywhere alongside power poles in the vicinity.







Client Testimonial

"As a company that’s been established on the Gold Coast for 15 plus years, it’s always been hard to find a level of service that Pete from YTB gives with the civil connections. We’ve been using YTB for nearly 5 years now and couldn’t recommend the team enough. From Low-risk connections to intricate OPW sewer diversions on main road corridors, the team at YTB seem to get it done without any hassles or issues. YTB’s relationship with all third-party entities on all civil connections are very close and well respected which is defiantly a reflection of the high level of professionalism and attention to detail on every job they have completed for us whether it be big or small. As YTB is a family owned and operated company it’s not uncommon to call the office to be redirected to peter the owner who will be onsite with his team and still take the time to discuss future works. It’s this reason YTB is our only choice when it comes to civil connections."

Jesse Backholm

Construction Supervisor

LET'S WORK TOGETHER

Interested in our civil connection services?
We'd love to work with you.